Technical evidence library
The development of the Lidsing Garden Community is informed by a suite of technical evidence and reporting which has already been accounted for and will continue to feed into the design process. This supporting technical evidence encompasses several key disciplines. The reporting work undertaken thus far is available to view here, separated into each of the technical fields that form part of the planning process.
Air Quality & Noise
Air Quality Technical Note
Noise Constraints Technical Note
Energy & Sustainability
Masterplanning
Illustrative Site Masterplan
Masterplan Framework Part 1
Masterplan Framework Part 2
Transport & Highways
Transport Assessment Volume 1
Transport Assessment Volume 2
Transport Assessment Volume 3
Strategic Road Network Access Options Appraisal
Interim Transport Modelling
Inputs to Strategic Modelling
M2 J4 Connection - Vertical Assessment Chainages
Technical Notes - Bus Connections
Arboriculture
Flood Risk & Drainage
Flood Risk and Drainage Technical Note
Planning
Utilities & Infrastructure
Ecology
Amphibian Survey Report - Nov 2024
Reptile Survey Report - Nov 2024
Bat Survey Report - Nov 2024
Dormouse Report - Nov 2024
Habitats Report - Dec 2024
Breeding Bird Report - Feb 2025
Wintering Bird Report - Feb 2025
Invertebrates Report - March 2025
Heritage & Archaeology
Cultural Heritage Desk-Based Assessment
Soil & Contamination
Economic Development
Employment Capacity Test
Landscape
Landscape & Visual Technical Note
Landscape Capacity Study
Key Views - Map
Key Views - Images
National Landscape Planting Proposals
Stewardship & Governance
Framework Stewardship Plan
